Search Result
Collapse
78 results in 0.0029 seconds.
Keywords
Members
Tags
-
Scheduled report won't save: "No project working folder is set"
Our quality department wants the daily OEE report as a PDF in a shared folder, not by email. On REPORT > Scheduled Reports I created a new scheduled... -
Our new PLC offers both Modbus TCP and OPC UA: which should we use?
We are buying a new filling machine, and the machine builder asks which interface we want for monitoring. The PLC supports both Modbus TCP and OPC UA.... -
Comparing the energy use of our six production halls side by side
Each of our six production halls has its own analyzer on the incoming feeder. Management wants a simple way to see which hall consumes the most, what... -
DataForge started a topic Can the shift supervisor assign missing downtime reasons from Shift Monitoring?in Proveris OEECan the shift supervisor assign missing downtime reasons from Shift Monitoring?
At the end of each shift our supervisor reviews the shift on SHIFT MONITORING before the handover. Some stops are shown in a different color on the Shift... -
LogicAutomation started a topic Where do I download the installers, and which documentation goes with them?in HelpWhere do I download the installers, and which documentation goes with them?
We have agreed internally to set up a test system for one of your products on a spare PC. Our IT colleague asked me for the installer and a short "what... -
ProcessPilot started a topic Tag Logs report: some analyzer values are missing from the available listin LogiphaseTag Logs report: some analyzer values are missing from the available list
I want a monthly report of the active energy and power factor for each of our 12 analyzers. In Reports > Tag Logs, the available list shows active... -
Night shift on Shift Monitoring: which date do I pick for 22:00–06:00?
We run three shifts and the night shift is 22:00–06:00. Every morning our production manager wants to look at last night's shift on SHIFT MONITORING... -
Can our management look at the web versions before we install anything?
We are preparing a short internal presentation for our management about production and energy monitoring. They are not technical and they won't read documentation,... -
SystemPulse started a topic Why must we type a message to acknowledge alarms, and where can we see it later?in LogiphaseWhy must we type a message to acknowledge alarms, and where can we see it later?
We started using Logiphase for our main distribution panels. When an over-current or voltage alarm comes in, the maintenance technician acknowledges it... -
Remote pump station over a 4G router: values freeze and the channel drops
We added a remote pump station to Omnivex SCADA. The PLC there is reachable through an industrial 4G router with a VPN, and we read it with a Modbus TCP... -
LogicAutomation started a topic Shift Monitoring shows a scissors icon and a shorter downtime than the login Proveris OEEShift Monitoring shows a scissors icon and a shorter downtime than the log
Our press line had a long stop that started at about 21:40 and ended around 22:35. Our shift change is at 22:00. When I open SHIFT MONITORING for the... -
Moving Proveris to a new server: does the project export include history?
Our IT department is replacing the server that runs Proveris OEE. I found the Export button under DEVELOPMENT > PROJECT, which downloads a .proverproject... -
Customer complaint: which shift and operator produced this product lot?
We received a customer complaint about a batch of flanges. The customer gave us the product lot number from the label. Our quality team now needs to find...