On our packaging line operators stop the machine for a 30-minute lunch break and two 10-minute tea breaks every shift. They select the right cause on the kiosk, so the downtimes are classified correctly. But on the dashboard the Availability for that line is always about 10% lower than the other lines, and the plant manager keeps asking why.
I checked the cause definitions and both "Break" and "Lunch" are marked as Planned Downtime. I expected planned downtime to be excluded from the OEE calculation automatically, but it looks like it isn't. Is there a separate setting for this, or do I have to shorten the shift times to remove the breaks?
I checked the cause definitions and both "Break" and "Lunch" are marked as Planned Downtime. I expected planned downtime to be excluded from the OEE calculation automatically, but it looks like it isn't. Is there a separate setting for this, or do I have to shorten the shift times to remove the breaks?